Day 68

May 25, 2008 by kotoman · 2 Comments 

Day 68 - second fit for electrics have been installed. Not overly impressed with the final finish - the sockets are not straight and the light pendents are showing some wires. The outside render has been painted.

Day 66

May 25, 2008 by kotoman · Leave a Comment 

Day 66 - We are weather tight, for the first time in 12 weeks, I don’t need to worry about the weather. The outside dormers are rendered and the outside wood work has been installed.

Day 64

May 20, 2008 by kotoman · Leave a Comment 

Day 64 - the plastering is now 100% complete. The 4 doors are now hung and dresses and the velux window above the stairs has been installed. We even have window cills. The front door is to be hung, so I made templates of all the door furniture and stuck it on the door so that the chippy would know exactly what is required. If I’ve learnt one thing working with this polish team is to be as simply descriptive as possible to avoid any misunderstandings.

Day 59

May 15, 2008 by kotoman · Leave a Comment 

Day 59 - Bathroom in but waste pipe attached to broken pipe so that needs fixing. The bathroom window and second bedroom has been fitted. Need to go through some details with builder as deadlines are getting passed. Had to haggle over doors being installed which was disappoiting but all has been resolved. Only 8 more days of wor until complete……we’ll see.

Day 56

May 12, 2008 by kotoman · Leave a Comment 

Day 56 - the floors are in. The rooms now look like rooms and hopefully the dust level, that falls everyday, will now decrease. The bathroom has started to be installed.