Day 66
May 25, 2008 by kotoman · Leave a Comment
Day 66 - We are weather tight, for the first time in 12 weeks, I don’t need to worry about the weather. The outside dormers are rendered and the outside wood work has been installed.
AsidesDay 64
May 20, 2008 by kotoman · Leave a Comment
Day 64 - the plastering is now 100% complete. The 4 doors are now hung and dresses and the velux window above the stairs has been installed. We even have window cills. The front door is to be hung, so I made templates of all the door furniture and stuck it on the door so that the chippy would know exactly what is required. If I’ve learnt one thing working with this polish team is to be as simply descriptive as possible to avoid any misunderstandings.
AsidesDay 59
May 15, 2008 by kotoman · Leave a Comment
Day 59 - Bathroom in but waste pipe attached to broken pipe so that needs fixing. The bathroom window and second bedroom has been fitted. Need to go through some details with builder as deadlines are getting passed. Had to haggle over doors being installed which was disappoiting but all has been resolved. Only 8 more days of wor until complete……we’ll see.
AsidesDay 56
May 12, 2008 by kotoman · Leave a Comment
Day 56 - the floors are in. The rooms now look like rooms and hopefully the dust level, that falls everyday, will now decrease. The bathroom has started to be installed.
AsidesDay 54
May 8, 2008 by kotoman · Leave a Comment
Day 54 - For the first time in the houses 100 years history, it has stairs. It is now, no longer and bungelow but a house - quietly proud of that, if truth be told. The plastering is now down to 1 wall to be done and the stairwell has been cutout and built.
Asides

br>

